Example: Example Flow - Changing a Core Asset
Example Flow of a sample activity. In this case, the activity performed is "Changing a Core Asset".
Description
Main Description

Every operation of Change has to interface with the RiPLE-EM (Evolution Mangement) process, showed in the picture below.
 


The first interface with the RIPLE-EM Process is with the "General-EM" Flow.


Inside the General EM flow, there are some specific areas covered like Change Management, Release Management, Version Control, Build Management, etc. In order to complete this activitiy we have to follow the Change Management activity, marked with a red circle.


Inside the Change Management flow, the activities available are shown, and in oder to achieve this specific example activitiy we are going to follow the activitiy marked with a red circle.


This lead us to another flow, specifically design to guide changes targeted at core assets, and is shown in the following figure. This flow has to be followed given the numbering proposed, but can take different ways. Three examples of possible paths that could be taken are described in the next figures.

One possible path)


Second possible path)


Third possible path)


Every Activity is broken down in several steps in order to properly execute it, as shown in the following image.





Once you concluded each and every step, the activity is then concluded.